Pullover sectional yarn. The Work Of Marina Efimenko

Pullover sectional yarn. Hello girls! I am again with new clothes. Pullover contacted very quickly, no bells and whistles. Two days and you’re done! Yarn “MAGIC Fantasy”(30% wool,70% acrylic). It took 5 skeins(134м in 100g). Spokes №3,5.

Pullover sectional yarn. The Work Of Marina Efimenko

Dimensions pullover: 36/38 (46/48).

You will need: 500 (600) g of beige yarn Miski (100% llama wool, 75 m/50 g); straight and circular needles number 5.

Knit garter: persons. and Phi. p. — persons. n. In circular rows knit alternately 1 circular entities. and R. Phi.

The front surface of: persons. p. — persons. p., Phi. R.-Phi. p.

Relief pattern: number of loops multiple of 18 + 3 + 2 chrome. Knit scheme, which are only individuals. p., in Phi. R. loop knit in pattern. Start with 1 chrome. and loops before rapport, rapport repeat, end loops after rapport and 1 chrome. Repeat from 1st to 32nd R.

Density knitting. Embossed pattern: 17. p. and 22 p. = 10 x 10 cm; persons. expanse: 17 p. and 20.5 p. = 10 x 10 cm

Description of pullover

Backrest: dial 77 (95) and tie straps for 3 cm garter viscous. Then knit a relief pattern. Through 35.5 cm = 78 p. from strap to close for armholes on both sides 3 and in each 2-m p. 1 x 2 and 3 x 1 n = 61 (79) p. Through 52 cm = 114 p. (57.5 cm = 126 p.) from the strap close to neckline average 21 (27) n and both sides finish separately. To round the close with the inner edge of each 2-m p. 1 x 3 and 1 x 2 n Through 55.5 cm = 122 p. (61 cm = 134 p.) from strap to close each side of the remaining 15 (21) p. shoulder.

Before: knit as well, but for a deeper neckline close after 48 cm = 106 p. (53.5 cm = 118 p.) from the middle of the strap 11 (17) section and in each 2-m p. 1 x 3, 2 x 2 and 3 x 1 n.

Sleeve: dial 40 (49) section and tie straps for 3 cm garter viscous. Then knit individuals. stitch. At the same time from the bar to allow for bevels sleeves on both sides in each 10-m p. 8 x (each 6-m R. 13 x) 1 n = 56 (75) p. Through 41 cm = 84 R. strips close to doused sleeves on both sides 3 and in each 2-m p. 1 x 2, 8 x 1 and 3 x 3 p (2 x 3, 2 x 2, 3 x1,2×2 and 3×3 on). Through 53.5 cm = 110 R. from strap to close the remaining 12(17) p.

Assembly: perform shoulder seams. By neckline dial on circular needles 78 (90) n and knit in garter viscous bar. At the height of the strap 3 cm all loops close persons. to Vacate sleeves, perform side seams and seams of sleeves.

Scheme knitting pullover:

Pullover sectional yarn. The Work Of Marina Efimenko