Set for girls "orange"

The kit is designed for the height 92-98 (2.5 years).
You will need: cotton 200g 100g orange and green thread.

Blouse:

Scored 73петли and knit according to the scheme No. 1 27 series, and then loop distributed as follows:
(1кромочная, 20петель scheme No. 2, 3лиц., 25петель scheme No. 3, 3лиц., 20петель scheme No. 2, 1кромочная) the diagram shows only facial series in rows purl knit in pattern, nakida are finished Phi.loop
The magazine offered to gain 81петлю: 28 according to the scheme №2, scheme 25, No. 3, 28 in scheme 2.

So, linking the desired length to the line of the Raglan (mine is 5 Rapoport scheme No. 3), we begin to form a line Raglan – “Through the two loops from the edge 17 times each second row (i.e., each face) are finished in 2петли together” And then formed the neckline… “25 the Central closed loops, then the edges 4 times every 2nd row close the loop” – the line of the Raglan I formed this: removed edge, then knit first loop, the next shot, then knit the third and stretched using a beveled, then the pattern… at the end 2вместе the front, then 1 face and edge. Provyazat 2 Rappoport scheme No. 3 covered the Central 25 turns and start shaping the neckline, focusing on the pattern.
Back knit similar to the front, not only do neck and close all the loops as soon as you connect the desired line of the Raglan.

SLEEVE:

49 dial loops and knit as Central 49петель back. The line of the Raglan to knit as well as to the details of the back.
Collar: dial the required number of stitches and knit according to the scheme №1 the first 14 rows.
All to steam, straighten the pattern, and sew.

Skirt

the upper part of the diagram No. 5 – dial 111 loops of orange yarn and knit 13 rows, then go to the green thread and knit on. Provatas 9cm, each Rappoport And one Central loop to 3петли purl and knit another 3 cm to close the loop.
the lower part of the skirt to gain green floss 35 loops and knit like this: 5петель scheme No. 2, 25 loops at scheme No. 3 and 5петель in scheme 2 starting with the pattern.
All stripped and sew. Bottom crochet tie art. b/n, and then the arches of 3V.p.
Diagram No. 4 is for six yellow buttons of her blouse. Left line Raglan sew to the end, and tie the region scheme No. 4 and sew on buttons.

Cap

Green thread to dial 35 loops and knit as the bottom of the skirt – to get a green floss 35 loops and knit like this: 5петель scheme No. 2, 25 loops at scheme No. 3 and 5петель in scheme 2 starting with the pattern.
Linking the right length for the girth of the head, stitch. Then the bottom to tie under the scheme №8 orange thread, and the top recruit hinges on the spokes (71петля) round and knit according to the scheme №7. To close the remaining loop.
Bundle 11 flowers for the skirt and 7 flowers for hats.

Set for girls "orange"

Set for girls "orange"